In autumn 2018, we managed to successfully conclude one important stage of technology transfer. In cooperation with the Damgaard company, the WAVE 50 micro power plant was launched on the market. The first commercial installation serves as a source of electricity and heat for the supply of the municipal office, shop and fire station in Mikolajice near Opava. Thanks to its outdoor design, the unit can be installed very quickly and is capable of reaching a heat output of up to 50 kW, and it can also process very low-quality wood chips without any problems. We are planning to start small-scale production in the near future.